| BTU | : | 125K Btu |
| Length | : | 50 ft |
Kit Includes:
- VPS125 Burner Box (1)
- VPA 20' Tube Package (1)
- VPB 30' Tube Package (1)
- TB2 3' Turbulator Insert (1)
- CK15 Turnbuckle Kit (1)
- CK11 50' Chain & 11 S Hooks (1)
- 1E78-140 Thermostat (1)
- Full input rate for elevations up to 2,000 ft.
- 115/1/60 supply voltage
- Multi-try direct ignition with soft lockout
- Single-stage combination gas valve
- Pre-purge and post-purge
- Low NOx levels (up to 40% reduction)